Skip to content
Riverbend Renovation

Uptown

Uptown Bathroom Remodel

Bathroom remodel

finished tiled shower with frameless glass door and grab bar
Shower opened to studs with new orange shower pan and level in place
BeforeAfter
Before: Shower opened to studs with new orange shower pan and level in place
After: finished tiled shower with frameless glass door and grab bar

Every older home presents its own challenges. This Uptown bathroom remodel required adapting the design as construction progressed, proving that flexibility, thoughtful planning, and quality craftsmanship are often the keys to achieving a successful renovation.

The Homeowner's Goals

The homeowners wanted to update an aging bathroom with a fresh, modern design while improving functionality and maintaining the character of their Uptown home. The goal was to create a space that looked beautiful while standing up to everyday use.

A Design Change During Construction

As demolition progressed, it became clear that one of the planned shower niches would conflict with the home's exterior wall construction. Rather than forcing the original design, Riverbend worked with the homeowners to revise the layout and relocate the niche, preserving both the appearance and long-term performance of the shower.

Building From the Inside Out

Like every Riverbend bathroom renovation, the project focused first on the work hidden behind the finished surfaces. The renovation included: Complete demolition Plumbing updates Electrical improvements Professional waterproofing Shower construction Custom tile installation Vanity installation Fixture upgrades Finish carpentry Painting and final detailing Each step was completed in the proper sequence to provide a durable, long-lasting bathroom.

Why Flexibility Matters

Older homes rarely match modern construction standards. Framing, plumbing, and wall construction often require adjustments during the renovation process. Having the flexibility to adapt the design while maintaining quality workmanship helped keep this project moving forward without compromising the finished result.

The Finished Bathroom

The completed bathroom delivered the modern appearance the homeowners envisioned while overcoming challenges discovered during construction. Careful planning and thoughtful adjustments produced a finished space that balanced design, function, and long-term durability.

What This Project Demonstrates

This renovation highlights several principles that guide Riverbend's approach: Older homes require flexibility. Not every design can be built exactly as originally planned. Proper waterproofing remains essential regardless of layout changes. Creative problem-solving often produces a better final result. Quality craftsmanship extends beyond the finished tile.

Project Highlights

Location: Uptown New Orleans Project Type: Bathroom Remodel Services: Complete renovation, waterproofing, custom tile, plumbing and electrical updates Unique Challenge: Redesigning the shower layout after discovering limitations within an exterior wall during construction.

Every photograph from this job

10 photographs

Stage
Area
  • finished tiled shower with frameless glass door and grab barAfter

    finished tiled shower with frameless glass door and grab bar

  • Shower opened to studs with new orange shower pan and level in placeBefore

    Shower opened to studs with new orange shower pan and level in place

  • finished glass shower with tile surround, grab bar and green wallAfter

    finished glass shower with tile surround, grab bar and green wall

  • Wall opened to studs with black waterproofing/vapour barrier behindDuring

    Wall opened to studs with black waterproofing/vapour barrier behind

  • Shower framing with orange pan and blue strappingDuring

    Shower framing with orange pan and blue strapping

  • Worker troweling waterproofing onto an orange Kerdi-board showerDuring

    Worker troweling waterproofing onto an orange Kerdi-board shower

  • Partial demolition — drywall removed back to studsDuring

    Partial demolition — drywall removed back to studs

  • Bathroom floor stripped to subfloor with plumbing rough-in and toolsDuring

    Bathroom floor stripped to subfloor with plumbing rough-in and tools

  • Wall opened to studs over black membrane, debris bag on floorDuring

    Wall opened to studs over black membrane, debris bag on floor

  • Bathroom stripped to the concrete mud bed with drain exposedDuring

    Bathroom stripped to the concrete mud bed with drain exposed

Other projects

Let's talk about your project

We start with a conversation and a site visit to define scope before pricing, so you know exactly what to expect.

Call (504) 215-8825Get a quote